Project Overview
Collins performed an underwater inspection of the phase III (berths 7 and 8) bulkhead rehabilitation and concrete underdeck repairs at the Jacksonville Port Authority Talleyrand Marine Terminal in Jacksonville, Florida.
The underwater inspection of approximately 1,800 feet of existing sheet pile bulkhead was a Level I inspection of all exposed portions of the existing sheet pile within the limits of the rehabilitation/replacement project. The inspection noted locations and sizes of existing bulkhead penetration as well as significant observable structural deficiencies. Collins provided a one-site visit/inspection and submitted the findings within three days of the completion of the inspection.