Project Overview
Reconstruction of the Marquette Interchange included a cut-and-cover tunnel for the exit ramp.
The excavation support system consisted of driven soldier piles with lagging and two levels of pipe struts. The excavation extended to a depth of approximately 28 feet through granular soils.