Project Overview
The upgrade of the Pershing Road sewer system included construction of an excavation support system for sewer tie-ins as well as deep shafts for the drop structure to the tunnel 110 feet below grade.
Excavation support for tie-ins was provided by a 46-foot sheet pile system in soft clays and soldier pile and lagging was used for upper access to the permanent lower caisson for tunnel access.