Project Overview
Reconstruction of the State Street and Chicago Avenue CTA subway station required excavation to a 38-foot depth in soft clays.
The excavation was adjacent to a school as well as Holy Name Cathedral, thus requiring tight control of ground movements. A drilled concrete secant pile wall was used for stiffness along with an upper level of cross-lot pipe bracing and two levels of prestressed tie-backs.