John Coffee Bridge Study

Muscle Shoals, Alabama

Owner: National Park Service

Scope of work:

  1. Concrete core sampling consisting of the extraction of a minimum of one core sample from the lower portion of each pier in the channel, below the waterline
  2. Concrete core testing consisting of strength tests and concrete quality tests
  3. Engineering report preparation with:
    • Evaluation of the condition of the substructure
    • Estimate of remaining life of the substructure under current conditions
    • Recommendations for repair work type and cost
A long bridge with concrete supports across a wide body of water, with distant hills visible under a clear blue sky.

Related Projects

A concrete bridge spans over a shallow body of water, surrounded by dry grasses and rocks under a clear blue sky.
Central | Transportation Engineering
A concrete culvert overgrown with vegetation runs beneath a road near an industrial area with buildings, parked trucks, and autumn trees in the background.
Central | Transportation Engineering
A narrow, cracked dirt road runs through a wooded area with trees and grass under a blue sky.
Southeast | Site/Civil Engineering

Build the Future. Grow Your Career. Make an Impact.

Join a team where your engineering skills directly shape communities as you grow alongside professionals who recognize your potential and value your success.

Start Your Career At Collins