Sauk Trail Over I-57 Bridge Rehabilitation
Richton Park, Illinois
Owner
Illinois Department of Transportation (IDOT)
Size of Project
Two-span continuous steel plate girder bridge
Scope of Work
- Bridge rehabilitation design
- Deck replacement
- Vertical clearance improvements
- Bearing replacement
- Concrete bearing seat extension design
- Approach slab replacement
- Structural steel repairs and painting
- Substructure repairs
- Roadway geometric design
- Drainage improvements
- Lighting coordination
- Temporary traffic signal design
- Survey and permitting coordination
Related Projects
Southeast | Transportation Engineering
Build the Future. Grow Your Career. Make an Impact.
Join a team where your engineering skills directly shape communities as you grow alongside professionals who recognize your potential and value your success.